Skip navigation


You are in:  Home » Publications » Reports » Report 9

Addendum 1.0 to SCAR Report #9 (August 1992)
January 22, 2002

Data-collector costs and data submission for CD-ROM production

SCAR Report 9
Addendum 1.0 Appendix A Appendix I Appendix II Appendix III
Appendix B Appendix C Appendix D Appendix E Appendix F

Appendix E : Example of processing parameter

PROCESSED BY GECO U.K.
DEMULTIPLEX FROM SEG-B
PROCESSING SAMPLE INTERVAL 4 ms
START OF DATA DELAY -40 ms
SPHERICAL DIVERGENCE COMPENSATION
DESIGNATURE SHOT BY SHOT USING SUMMED AUTOCORRELATIONS (EXCEPT FOR LINES AMG845-15 AND AMG845-16)
PREFILTER 8Hz - 70 Hz (ONLY LINE AMG845-15 AND AMG845-16)
DECONVOLUTION
TYPE MINIMUM PHASE LEAST SQUARES INVERSE
OPERATOR LENGTH 300 ms
PREDICTION LAG 24 ms (FOR LINE AMG845-16 TO AMG845-18)
36 ms (FOR LINE AMG845-19 TO AMG845-24)
NMO CORRECTIONS VELOCITIES FOR NMO CORRECTIONS DERIVED FROM CONTOURED VELOCITY SPECTRA. VARIABLE VELOCITY GATHERS AND VARIABLE VELOCITY STACKS
PRE-STACK MUTE
COMMON DEPTH POINT STACKING
FOLD 24
OFFSET WEIGHTING BY X / (X +XL) (FOR ALL LINES EXCEPT AMG845-16)
PROPORTIONAL TO X (FOR LINE AMG845-16)
3 TRACE RUNNING MIX WEIGHTS 1 : 2 : 1
STATIC CORRECTIONS
SHOT AND STREAMER STATIC +12 ms
BANDPASS FILTER
LC (Hz) HC (Hz) SLOPES
(Db per octave,
low/high)
15 75 30/120
EQUALISATION
WINDOW LENGTH 1000 ms
PERCENTAGE OVERLAP 50